Hebi Container House Construction
The construction of container houses in Hebi can be carried out through steps such as selecting professional companies, clarifying demand types, and paying attention to construction key points.

Select Professional Construction Companies
Hebi Tianchen Color Steel Plate Co., Ltd. is a professional color steel plate enterprise that integrates development, research, design, production, and on-site construction. It has a high-quality professional consortium for design, marketing, production, and construction. It can provide integrated services including design, production, construction, and after-sales service, and can install container mobile houses of various specifications such as dormitories, kitchens, and office buildings. Hebi Jifei Construction Engineering Co., Ltd. has a business scope that includes steel structure engineering, and it has business qualifications such as construction machinery and equipment leasing and construction labor subcontracting. It can also undertake container house construction-related projects.
Clarify Container House Types
- Traditional Type: It is transformed from traditional cargo containers, with a sturdy structure and strong load-bearing capacity, enabling the reuse of discarded cargo containers.
- Welded Type: It has a relatively complete structure and is a popular style in recent years. It is relatively convenient for installation and movement, with a typical service life of more than ten years, and has relatively low material costs. It is used in various places.
- Demountable Type: It adopts modular production technology, allowing the mobile house to be disassembled into components in a modular way and transported to the application site for assembly. This can effectively reduce transportation costs, speed up installation and disassembly, and is widely used in construction sites.
Pay Attention to Construction Key Points
- Moisture-proof Treatment: For container houses with cotton-core interlayers, attention should be paid to moisture-proof issues. For example, use a stapler to staple the cotton-to-cotton horizontal connections on the facing flanges; trim the glass wool and install the wall color steel plates; cut off the glass wool blanket at a point 20 cm beyond the wall purlins and fix it with double-sided tape; have the facing facing the indoor side, unroll it from the eaves to the corner and fix it to the lower purlins with double-sided tape, leaving an extra 20 cm.
- Quality Control: Select companies with strict quality management to ensure that the quality of the container houses meets the requirements and guarantees safety and durability during use.




