The installation of container houses in Handan should be carried out by professional teams, and the process covers foundation preparation, main body installation, detail handling, and acceptance . The following explains from three aspects: installation process, precautions, and service teams.

I. Installation Process

  1. Foundation Preparation
    Before installing a container house, ensure that the ground is level. Usually, a concrete foundation or a workbench is used. For example, Hebei Jiacheng Integrated Housing Co., Ltd. requires that the chassis of its packing boxes be placed on a prepared foundation to ensure stability. For temporary use, a steel chassis can also be directly placed on a hardened ground, but the ground's load-bearing capacity needs to be checked.

  2. Main Structure Installation

    • Chassis and Frame Connection: Use hexagon socket bolts to connect the bottom corners of the box to the bottom beams. Do not tighten them temporarily. After adjusting the diagonal difference of the bottom frame to be ≤ 3mm, tighten the bolts.
    • Column and Roof Frame Installation: Install four hexagonal columns and then fix the roof frame to form the main frame of the house.
    • Secondary Beam and Floor Installation: Install π-shaped secondary beams according to the positioning holes, lay the floor base plate (such as magnesium oxide board), mark and lay the floor along the centerline, and fix it with self-tapping screws at intervals of 300-350mm.
  3. Detail Handling

    • Floor Sealing: Polish the floor joints, apply PVC special floor adhesive, lay the floor covering and expel the air. The joints can be welded.
    • Circuit and Decoration: Install the circuit system, reserve positions for sockets and lighting, and then place furniture for direct use after completion. Some manufacturers offer personalized designs, such as Xingda Color Steel, which can customize color steel sandwich panel walls and install air conditioners.

II. Precautions

  1. Load-Bearing and Usage Restrictions
    Do not place heavy objects or step on the roof of the container house, as this can easily cause water leakage. The walls are made of color steel sandwich panels, and drilling and nailing are strictly prohibited (except for air conditioner installation). Use suction cup hooks for hanging items.

  2. Transportation and Lifting Specifications
    When transporting, use four steel wire ropes of no less than 5 meters to lift the four corners simultaneously. Do not use a hook machine for direct lifting to avoid deformation of the container.

  3. Electrical Safety
    Do not use high-power electrical appliances such as electric stoves and electric kettles in the house. Electrical wires should not be exposed or come into contact with a humid environment to prevent fire or electric shock risks.

III. Selection of Service Teams

There are several professional teams in the Handan area that provide container house installation services, such as:

  • Xingda Color Steel: Offers one-stop services including design, production, sales, and installation, with cases covering color steel plate movable houses and quick-assembly container houses.
  • Hebei Jiacheng Integrated Housing Co., Ltd.: Focuses on the installation of packing boxes and folding houses, with standardized processes and inspection standards.
  • Hebei Zhuanzhu Technology Co., Ltd.: Promotes the application of container-type houses in industrial parks and construction sites in combination with prefabricated building policies.

It is recommended to contact service providers through channels such as 58.com and corporate official websites, clarify requirements (such as customized or standard models), and then obtain quotations and construction plans.