The installation steps for mobile toilets in Guigang need to be determined according to the specific type, mainly divided into two types: integrated mobile restrooms and simple mobile toilets. The specific procedures are as follows:

Integrated Mobile Restroom Installation Steps

  1. Site Preparation

    • Confirm that the installation site has a flat ground and reserve sewage discharge interfaces (direct-discharge types need to be connected to the municipal sewage network, while collection types need to be equipped with sewage tanks or septic tanks).
    • Ensure that external water sources (or built-in water tanks) and power supplies (municipal power or solar power) are in place to avoid interruptions during subsequent construction.
  2. Lifting and Positioning

    • Use lifting equipment to hoist the prefabricated integrated box (including steel structure framework, composite panel enclosure, anti-slip floor, etc.) to the target location.
    • Note: During the lifting process, avoid colliding with the box to prevent structural or panel damage.
  3. Pipe Connection

    • Connect the sewage pipes of internal sanitary fixtures (such as toilets and washbasins) to the reserved interfaces: direct-discharge types are connected to the municipal sewage network, while collection types are connected to sewage storage devices.
    • Connect the water supply system to external water sources or start the built-in water tank to ensure a stable water supply.
  4. Electrical Debugging

    • Turn on the power supply for equipment such as lighting and exhaust fans, and test whether functions such as smart induction flushing and automatic disinfection are working properly.
    • If the equipment is equipped with solar panels, check whether the sun exposure angle meets the charging requirements.
  5. Seal Inspection

    • Check whether the sealing strips or sealants at interfaces such as sewage pipes and water tank connections are intact, with a focus on inspecting easily leaking parts such as elbows and tees.
    • Only proceed to the next step after confirming that there is no risk of leakage.
  6. Acceptance and Use

    • After cleaning the site, conduct a water test: flush with a small flow to check the smoothness of sewage discharge and flush with a large flow to check for interface leakage.
    • After confirming that there are no abnormalities, it can be put into use.

Simple Mobile Toilet Installation Steps (Requiring Short-Distance Relocation)

  1. Using a Relocator

    • Chisel out 20-40mm of the ground floor slab and embed a finished relocator (an elliptical flat pipe with a height of about 60mm), with one end connected to the original sewage pipe and the other end extending to the target location.
  2. Ground Treatment

    • Pour a flat ground and apply waterproofing (with a height of about 20mm), lay tiles (with a height of about 30mm), and leave a 3-4cm construction slot for relocator installation.
  3. Fixing the Relocator

    • Insert the lower interface into the sewage pipe and backfill with cement slurry, and connect the upper interface to the toilet sewage outlet.
    • Apply PVC special adhesive at the connection and install a sealing ring (to prevent flipping, lubricant can be applied for assistance).
  4. Seal Filling

    • Fill and seal the empty space after relocation with cement or waterproof materials to ensure a reasonable pipe slope (a slope of more than 3% is required for relocations exceeding 300mm).
  5. Installing the Toilet

    • Align the toilet with the upper interface of the relocator, fix it, and then connect the water inlet hose.
    • Open the water inlet valve and flush to test for sewage discharge and leakage. The relocation distance should be controlled within 100mm-350mm, and should not exceed 400mm at most, otherwise the risk of blockage will increase.

Precautions:

  • The installation of an integrated mobile restroom takes several hours and is suitable for emergency or short-term projects without complex water and electricity works.
  • For inter-floor drainage modifications, consult with the downstairs occupants and ensure proper waterproofing and trap installation.