German prefabricated assembly house technology started early and has developed maturely. Nowadays, it has significant characteristics in terms of construction process, energy-saving integration, and common types.

Development History

The prefabricated concrete panel building technology in Germany developed relatively early. The earliest prefabricated concrete panel building was constructed between 1926 and 1930 in the Lichtenberg-Friedrichsfelde area of Berlin, which was a residential area for war-disabled veterans. This project included 138 residential units and used large-scale on-site prefabricated concrete multi-layer composite panel components, with a maximum weight of 7 tons, demonstrating the advanced nature of the prefabricated concrete technology at that time.

Construction Process

Nowadays, when constructing prefabricated independent houses, tasks such as site leveling, foundation pit treatment, and on-site pouring of concrete for the basement foundation slab are carried out first. Then, double-layer hollow prefabricated reinforced concrete wall panels are hoisted to enclose the basement walls, and prefabricated wooden structural wall panels produced in the factory are also hoisted and erected. Parts such as the roof structure are also assembled using prefabricated components, and the entire construction process is highly standardized.

Integration with Energy-Saving Standards

German prefabricated assembly house technology is integrated with energy-saving standards. For example, during construction, a layer of foam insulation board is laid first at the position of the basement floor slab, followed by a layer of waterproof and moisture-proof membrane, and finally, concrete is poured on site. The double-layer prefabricated reinforced concrete wall panels used have outer cladding panels consisting of two layers of concrete with a 50-thick extruded polystyrene board in between, providing better thermal insulation performance than the external wall insulation of traditional buildings and effectively improving the energy-saving effect of the houses.

Common Types

When building single-family houses in Germany, prefabricated houses (Fertighaus) are one of the common choices. Most of the components of prefabricated houses, such as walls and roofs, are produced in the factory and then transported to the construction site for assembly. The on-site construction speed is fast, and it is relatively less affected by the weather. The construction process is also more standardized, meeting people's needs for quick move-in and high-quality living.