Back to blog
Article

Gaoqing Prefabricated Housing

Admin September 17, 2026

Gaoqing County has made significant progress in the field of prefabricated housing (prefabricated buildings), including project implementation, corporate transformation, and policy support.

Project Case

Tianxing Shuyuan Shangpin Building No.1 is the first prefabricated building project in Gaoqing County, developed by Zibo Zhengyuan Real Estate Development Co., Ltd. It consists of 72 residential units and is located north of Huanghe Road and west of Xuefu Road in Gaoqing County. The building adopts prefabricated technology, with pre-assembled components such as panels, columns, and beams produced in factories. On-site construction only requires professional assembly, replacing traditional reinforced concrete cast-in-place operations. This construction method offers significant advantages: high production efficiency, which shortens the construction period; excellent housing quality with high-precision components; fast construction speed, reducing on-site operation time; fewer safety hazards, lowering the risk of high-altitude operations; and less construction waste, aligning with green and environmentally friendly concepts.

Corporate Transformation

Zibo Hanlin Building Materials Technology Co., Ltd., originally engaged in commercial concrete production, has transformed and ventured into the field of prefabricated buildings due to market changes. The company has experimented with the "cement movable house" project, where its reinforced concrete integrated structure "cement movable houses" fall under the category of prefabricated buildings. These are prefabricated into modular units in factories and then transported to construction sites for direct installation and assembly. The company has made technical improvements by incorporating characteristics of northern regions, adding external insulation modules and equipping buildings with insulation panels of different materials based on their intended use, enhancing housing insulation performance. Its third-generation mold unit can reach dimensions of 5m×8m, adjustable according to user needs, and new equipment has been customized to expand production scale, expected to provide more employment opportunities.

Policy Support and Services

Gaoqing County actively implements the requirements of the Zibo Housing and Urban-Rural Development Bureau's "Notice on Early Handling of Pre-sale Permits for Commercial Housing in Prefabricated Buildings." The county's Administrative Approval Service Bureau intervenes early during the project construction permit stage, providing precise "one-on-one" and "point-to-point" services. Tailored to the characteristics of prefabricated buildings, the bureau offers guidance for enterprises in subsequent procedures for handling housing pre-sale permits. For example, when Tianxing Shuyuan Shangpin Building No.1 met pre-sale conditions, the approval department promptly organized a pre-sale approval team to accept the application, proactively provided "assistance and agency" services, helped prepare materials, and quickly completed on-site inspections and issued pre-sale permits under the premise of complete materials and compliant on-site progress, optimizing the approval process and facilitating project advancement.