Double-Layer Construction Site Mobile Toilet Installation
The installation of double-layer construction site mobile toilets should follow the following steps and key points:

1. Pre-installation Preparation
Plan the installation location in advance to ensure a flat and solid ground, away from main construction roads, pollution sources, and flammable and explosive areas. For double-layer structures, focus on foundation treatment: clear debris from the ground and lay gravel or concrete foundations according to load-bearing requirements (single-person toilet ≥ 200kg/㎡). In areas with special climates (such as Xinjiang), additional 5cm-thick insulation cotton layers or concrete weight blocks should be installed to enhance wind resistance and thermal insulation.
2. Main Structure Installation
Double-layer toilets often adopt a modular design, with boxes assembled on-site using high-strength bolts. Ensure the boxes remain level during installation to avoid tilting, and coordinate actions when multiple people are working together. If specific models are involved (such as products from Dezhou Hongtu Metal Products Co., Ltd.), their exterior walls may use thermally insulating golden carved panels, and attention should be paid to the sealing of joints to prevent rainwater infiltration.
3. Waterproofing, Odor Control, and System Connection
Double-layer structures require enhanced waterproofing techniques: apply polyurethane waterproof coatings on the ground and add waterproof membranes at joints; some high-end models are equipped with biological degradation systems that use bacteria to decompose feces and reduce odors. Sewage pipes should be sealedly connected to the construction site drainage system or temporary collection pits to prevent leakage; the design of skylights and ventilation louvers can enhance natural lighting and ventilation.
4. Inspection, Debugging, and Safety Maintenance
After installation, conduct internal and external inspections: internally, confirm that facilities such as sinks and hooks are secure, and test the flushing function and drainage pipe patency; externally, check the sealing of the boxes to ensure no water or air leakage. Set up clear signs around the toilets to avoid collisions. Assign dedicated personnel for daily cleaning and regularly inspect and maintain electrical circuits and valves to ensure safe operation.
5. Environmental Adaptation Design (Optional)
For extreme climates or special needs, additional thermal insulation layers (such as 5cm-thick insulation cotton) or wind-resistant structures (such as concrete weight blocks) can be installed. If designed for separate male and female areas, reasonably plan the location of public handwashing areas to ensure convenience of use.