Disassembly Prefabricated Housing
The construction, selection, and management and demolition methods for disassembly prefabricated housing are as follows:

Construction Method The construction process of prefabricated detachable container houses follows a standardized procedure:
- Foundation Installation: First, install the bottom frame to ensure structural stability;
- Main Structure Assembly: Connect the columns and lay MGO boards (a fire-resistant and moisture-proof building material), followed by installing the top frame;
- Enclosure System: Install wall panels and ceilings sequentially, and secure the electrical wiring;
- Functional Enhancement: Lay insulation materials to improve thermal insulation performance, and finally install drainage channels and roof tiles to complete the waterproofing system. This process emphasizes modular design, facilitating subsequent disassembly and reuse.
Type Selection There are various types of disassembly-type mobile houses on the market, which need to be matched according to specific needs:
- Outdoor Construction Site Detachable K-type Portable Panel Houses: Suitable for temporary construction scenarios, mostly made of light steel structures, with lower prices but limited durability;
- Folding Packing Box Mobile Houses: Characterized by a foldable design, with low transportation costs, suitable for scenarios requiring frequent relocation;
- Cross-border Manufacturer Customized Detachable K-type Portable Panel Houses: Support personalized customization, with flexible materials and specifications, but with a longer delivery cycle. When selecting, it is necessary to comprehensively consider usage scenarios, budget, construction period, and material durability.
Management and Demolition Path The management of prefabricated panel houses is incorporated into the urban renewal system, with safety as the core orientation:
- Safety Inspection and Graded Management: Conduct structural safety assessments of the houses, establish and dynamically update C- and D-grade dangerous housing archives;
- Differentiated Treatment:
- C-grade Dangerous Houses: Prioritize reinforcement and renovation to extend their service life;
- D-grade Dangerous Houses: Accelerate demolition and reconstruction to eliminate safety hazards;
- Renovation Methods: Include original-site reconstruction (rebuilding on the original site) and expropriation and resettlement (resettling residents through monetary compensation or property rights exchange);
- Policy Orientation: Management emphasizes "steady progress" and avoids a "one-size-fits-all" approach, making comprehensive decisions based on the safety condition and renovation value of the houses. For example, after 2026, the urban renewal plan will focus on promoting the demolition and renovation of D-grade dangerous houses, while improving supporting policies to safeguard residents' rights and interests.
Summary The construction of disassembly prefabricated housing should follow a standardized process, with type selection matching actual needs, and management and demolition based on safety assessments, achieving optimal resource allocation through graded management. This system not only ensures the flexibility of temporary buildings but also promotes the long-term improvement of urban housing safety.