Back to blog
Article
Dezhou Mobile Toilet Installation Guide
Admin September 28, 2026
The installation of mobile toilets in Dezhou requires step-by-step operations based on the toilet type (split-type or integrated-type). The specific process is as follows:

I. Pre-installation Preparation
Site Planning
- Select a solid ground area with good drainage, avoiding soft or uneven ground. If the ground conditions are insufficient, harden or lay steel plates in advance.
- Measure the site dimensions to ensure they match the specifications of the mobile toilet chassis, preventing installation difficulties due to size mismatches.
Tool and Material Preparation
- Basic tools: forklift (for chassis handling), spirit level, wrench, screwdriver, etc.
- Connection materials: bolts, buckles, sealing gaskets, Teflon tape (for wall and pipe sealing).
- Special materials: PVC special adhesive (if using a pipe shifter to connect the sewage pipe), quick connectors (for water and electricity connections in integrated toilets).
II. Installation Steps for Split-type Mobile Toilets
Chassis and Frame Positioning
- Use a forklift to place the prefabricated steel structure chassis steadily in the predetermined position, adjusting it to a level state with a spirit level to prevent subsequent installation from tilting.
Wall and Roof Panel Installation
- Insert the sandwich panel wallboards into the chassis slots one by one, securing them with bolts or buckles to ensure wall stability.
- When installing the roof panel, focus on checking the sealing to prevent rainwater leakage.
Internal Facility Connection
- Toilet and Flush System: When connecting the sewage pipe, ensure a slope of ≥3%. If necessary, use a pipe shifter and apply PVC adhesive to install a sealing ring.
- Sink and Water Supply: After cleaning the water supply pipe, reserve the inlet and outlet dimensions (e.g., 75±3mm), wrap with Teflon tape, and connect to a foot valve or faucet.
- Ventilation and Lighting: Install exhaust fans and lights, connect the circuit, and test the operation.
Functional Debugging
- Flush Test: Check if the toilet drains smoothly to avoid blockages.
- Leakage Check: Focus on checking the pipe connections and valve sealing gaskets for water leakage.
- Foot Pedal Test (if applicable): Step on the foot pedal to confirm that the lid opens and closes smoothly, and the connecting rod roller slides along the track without jamming.
III. Installation Steps for Integrated-type Mobile Toilets
Lifting and Positioning
- Use lifting equipment to hoist the factory-prefabricated box-type toilet as a whole to the target position, avoiding collisions or tilting.
Water, Electricity, and Sewage Connection
- Connect water and electricity through quick connectors, ensuring tight sealing of the interfaces to prevent water or electricity leakage.
- If connecting to the municipal sewage pipe network, plan the pipe route in advance and reserve a slope.
Functional Inspection
- Test the flush, lighting, ventilation, and other systems to confirm no faults before putting them into use.
IV. Precautions
Safety Regulations
- Installation personnel must wear protective equipment to avoid high-altitude operation risks.
- Electrical connections must be operated by professionals and comply with the "Mobile Toilet Hygiene Specifications" (GB/T 21239-2023).
Material Maintenance
- Regularly check the aging of bolts and sealing parts, and replace damaged components in a timely manner.
After-sales Support
- Contact local suppliers in Dezhou (such as Dezhou Shenglin Environmental Protection Technology Co., Ltd.) for customized installation plans or a ten-year after-sales guarantee.
Simplified Process: Positioning → Chassis Positioning → Wall Installation → Roof Panel Sealing → Internal Facility Connection → Water and Electricity Debugging → Functional Acceptance.
Related




