Dawang High-Tech Zone Prefab House
The prefab house project in Dawang High-Tech Zone is the Jinweijian AI Prefab House (Artificial Intelligence Prefab House) R&D, Design, and Trade Headquarters Project. Here is a detailed introduction to the project:

Project Overview
Located in the area around Yalv in Zhaoqing High-Tech Zone, north of Dongli Street, the project has a total investment of approximately 300 million yuan and covers an area of about 35 acres. Its core businesses include the R&D, design, and production of products such as mobile homes, Prefab Houses, folding containers, camp homestays, and smart hotel-style space capsules. Upon reaching full production capacity, the annual output value is expected to reach 260 million yuan. Leveraging over 20 years of industry experience from its parent company, the project focuses on foreign trade exports, with products covering more than 100 countries and regions in the Middle East, Europe, America, and Southeast Asia, making it a leading enterprise in China's foreign trade sector for mobile homes.
Parent Company Background and Advantages
Founded in 2016, the parent company is a comprehensive enterprise integrating the R&D, production, and sales of mobile homes and residential container products, with integrated industrial and trade capabilities. Its core advantages lie in:
- Technical Accumulation: With over 20 years of experience in exporting mobile homes, its product technology is mature and meets international standards.
- Market Coverage: Its foreign trade network spans the globe, with a stable customer base and significant brand influence.
- Innovation-Driven: By empowering prefab house R&D with AI technology, it enhances product intelligence levels, such as the integrated design of smart hotel-style space capsules.
Prefab House Renovation Policy in Dawang High-Tech Zone, Zhaoqing City
Currently, the specific start time for the renovation of prefab houses and dilapidated buildings in Dawang High-Tech Zone, Zhaoqing City, has not been determined. According to the dilapidated building renovation plan released by the Ministry of Housing and Urban-Rural Development:
- Timeline: Starting from 2025, a new policy for prefab house renovation will be fully implemented, requiring the completion of 30% of the national dilapidated building renovation tasks by the end of 2025 and achieving the goal of eliminating all dilapidated buildings by the end of 2027.
- Local Implementation: The specific start time for Dawang High-Tech Zone in Zhaoqing City needs to be further clarified based on local government implementation details, including the scope of renovation, compensation standards, and funding arrangements.
Conclusion
The prefab house project in Dawang High-Tech Zone, centered around Jinweijian AI Prefab House, focuses on high-end product R&D and foreign trade exports, boasting strong technical capabilities and a solid market foundation. As for the prefab house renovation policy, it is subject to subsequent notifications from local governments. It is recommended to follow the official information released by the housing and construction department of Zhaoqing City for the latest updates.




