Container House Production Process
The container house production process involves disassembling the house into standardized modules, completing most of the construction procedures in the factory, and then transporting them to the site for assembly into a complete building. The specific production process is as follows:

I. Module Disassembly and Design Container houses adopt a modular design concept, dividing the entire building into six standardized components: the bottom, top, and four sides, or directly using complete containers as modification units. During the design phase, it is necessary to consider the adaptive combination methods of the containers. By assembling different modules, spatial expansion can be achieved to meet the diverse needs ranging from single-container residences to large-scale combined buildings. Parameters such as the 25-ton load-bearing capacity of international standard 20-foot containers and the 45-ton load-bearing capacity of 40-foot containers provide a fundamental basis for structural design.
II. Factory-based Production Process
Steel Structure Processing
Automated production lines are used to complete frame welding. For example, a smart factory in Guangdong achieves high-precision manufacturing through robotic collaborative operations, with manufacturing precision stably controlled within 1-2 millimeters. The Shenzhen concrete MiC production line is equipped with 190 workstations. After materials are input from one end, they are processed by more than 80 professional equipment to form finished modules with exclusive QR codes, enabling full-process traceability.Enclosure System Prefabrication
Wall and roof panels are prefabricated using color-coated steel plates, sandwich panels, or fire-resistant materials. Simultaneously, internal decorations such as bathroom waterproofing, bathroom fixtures, and cabinets are completed. A manufacturer in Beijing's residential containers adopt a steel chassis, with walls composed of a combination of steel plates and wooden veneers, ensuring both structural strength and improved living comfort.Mechatronic System Integration
Water and electricity pipelines and electrical systems are pre-installed in the factory. Some production lines can simultaneously integrate equipment such as solar panels and intelligent control systems. The Shenzhen concrete module production line transfers more than 70% of the construction procedures to the factory, significantly reducing on-site wet operations.
III. Transportation and On-site Assembly After the modules arrive at their destination by sea or land transportation, lifting equipment is used for rapid assembly. A manufacturer in Beijing's container mobile homes can be built into a two-story structure, achieving stable combination between modules through standard connectors. A manufacturer in Shaanxi's packaged container houses support flattened and compressed transportation, with a 40-foot high cube container capable of loading six sets of houses. During installation, four workers can complete the assembly of a single container in three hours.
IV. Quality Control Points Strict standards are implemented throughout the production process: Steel structure welding must pass non-destructive testing, wall insulation performance must meet the requirements for warmth in winter and coolness in summer, and seismic design must reach an eight-degree intensity standard. The Shenzhen production line monitors manufacturing precision at the millimeter level in real-time through an intelligent detection system, ensuring that each module meets building code requirements.