Container House Installation Master
The container house installation master is primarily responsible for the entire process of container house work, from design to installation, commissioning, and after-sales maintenance. The specific responsibilities are as follows:

1. Pre-installation Preparation
Conduct project negotiations based on customer needs and site conditions to clarify the purpose of the container house (such as dormitories, offices, warehouses, etc.), specifications, dimensions, and functional configurations. Subsequently, perform site measurements to assess ground flatness, load-bearing capacity, and the surrounding environment to ensure compliance with installation requirements. Based on the measurement results, create an installation plan covering foundation treatment, container layout, water and electricity line planning, etc., and verify the plan's feasibility with the customer by reviewing the details of their needs. For example, Zhoushan Tianji Container Technology Co., Ltd. ensures installation quality through a professional process before project implementation.
2. On-site Installation and Construction
- Foundation Treatment: Perform ground hardening, lay ground beams, or embed bolts according to the plan to ensure the stable installation of the container. For example, the installation of prefabricated container houses in Taiyuan requires embedding foundation bolts and reinforcing the overall structure.
- Container Assembly: Use lifting equipment to position container modules and secure them through bolt connections, welding, etc. Install doors, windows, partitions, and other components. For example, when Farilelai installs packed container houses, they first fix the corner aluminum and then install the wall panels.
- Installation of Supporting Facilities: Complete the laying of water and electricity lines, installation of lighting systems, and commissioning of ventilation, insulation, and other facilities to ensure the complete functionality of the house. For example, the container houses of Xi'an Tengdaxing Housing Engineering Co., Ltd. adopt air-break thermal insulation design, requiring a focus on checking sound insulation and thermal insulation effects.
3. Quality Inspection and Acceptance
After installation, conduct a comprehensive inspection, including structural stability, airtightness, and water and electricity safety, to ensure compliance with standards such as the "Building Structural Load Code." For example, when building double-layer packed containers, Shanxi Xiangzu Mengren Building Materials Co., Ltd. requires the technical leader to sign off on the plan and report it to the building safety supervision station.
4. After-sales Service and Maintenance
Provide container house repair, renovation, and transformation services, such as color steel house renovation painting and steel structure reinforcement. Regularly follow up with customers to resolve issues during use and extend the service life of the house.