Container House Customization Process

Admin September 15, 2026

The container house customization process generally includes stages such as design, production, transportation, and installation, as detailed below:

Design Phase: Complete structural design and detailed drawings based on user requirements. During the design process, factors such as the intended use of the house, dimensions, layout, and functional modules must be fully considered. For example, a container house intended for residential use should consider the planning of spaces such as bedrooms, living rooms, kitchens, and bathrooms; while one intended for office use should consider the setup of office areas, conference rooms, and rest areas. Additionally, for special造型 requirements, such as streamlined or geometric cuts, precise planning is also necessary during the design phase.

Production Phase:

  • Steel Processing: Perform steel cutting, welding, and surface treatment to form a steel structural framework. The thickness of the steel used for main beams and columns, as well as the fullness of the welding process, will affect the load-bearing capacity and safety of the house, and must be carried out strictly in accordance with standards.
  • Wall and Roof Panel Processing: Conduct composite processing of wall and roof panels, filling them with insulation materials and covering them. Common wall panel materials include fire-resistant polyurethane sandwich panels and rock wool panels, and the appropriate material should be selected based on the intended use of the house and fire safety requirements.
  • System Pre-installation: Perform pre-installation of systems such as doors and windows, electrical, and plumbing to ensure the normal operation of each system.
  • Trial Assembly: Before leaving the factory, most manufacturers will conduct a trial assembly to check for any mismatches in components and promptly identify and resolve issues.

Transportation Phase: Transport the produced container house components to the site. The transportation distance will affect the transportation time and cost, so it is necessary to合理安排 (reasonably arrange) transportation routes and times.

Installation Phase: During on-site installation, simply hoist the modules into place and complete the assembly. For requirements involving double-story or row installations, it is necessary to confirm whether the manufacturer has the connection technology for multi-story frameworks and the ability to handle waterproof joints to ensure the overall stability and waterproofing performance of the assembled structure.