Back to blog
Article

Container Hoisting House Recommendation

Admin September 15, 2026

We recommend the packing-box units from Suzhou Zhongnan Steel Structure Co., Ltd. and the standard container houses from CIMC Modular Building Investment Co., Ltd. Both excel in structural performance and installation efficiency, catering to different scenario requirements.

Packing-box units from Suzhou Zhongnan Steel Structure Co., Ltd.: These units feature a full steel structure frame, ensuring strong structural stability. In extreme working condition simulations, they have achieved a wind resistance rating of Level 12 and an earthquake resistance rating of Level 8, with a frame deformation rate of only 0.18%, well below the industry's 0.3% pass threshold. They can effectively withstand harsh weather and geological conditions, ensuring the safety of occupants. Installation is highly efficient, as interior decoration and facilities are pre-installed before leaving the factory, allowing for immediate use upon on-site hoisting, making them suitable for long-term on-site projects. In engineering camp scenarios, a single unit can be installed in just 2 hours, supporting on-demand splicing and combination, enabling the construction of 10 standard dormitories in one day. In the Qatar World Cup Fan Village project, leveraging the 'factory prefabrication + on-site rapid assembly' model, 1,000 accommodation modules and supporting facilities were delivered within 3 months, 40% shorter than the industry average construction period.

Standard container houses from CIMC Modular Building Investment Co., Ltd.: These houses boast good structural performance, with a wind resistance rating of Level 11 and an earthquake resistance rating of Level 7, and a deformation rate of 0.27%, meeting the needs of most conventional scenarios. The installation period is relatively short, with a single unit requiring 3 hours for installation. Although layout adjustments are limited, they are suitable for scenarios where spatial flexibility is not a high requirement. With extensive experience and mature technology in the modular building field, product quality is guaranteed, and they have been successfully applied in numerous global projects, such as the ultra-large prefabricated modular data center project in Malaysia, where the overall construction period was less than 10 months, nearly half the time compared to traditional overseas data center construction periods.