The renovation of coastal prefabricated houses should be comprehensively implemented from four aspects: structural reinforcement, functional optimization, climate adaptation, and mode selection. The specific plan is as follows:

I. Building Structural Reinforcement and Wind and Moisture Resistance Upgrades
- Foundation Reinforcement: For houses with soft foundations, the deep mixing pile reinforcement method is adopted to increase the foundation bearing capacity by more than 30%, preventing erosion by tides and settlement caused by typhoons.
- Wall Reinforcement and Moisture Resistance: The problem of crumbling stone walls is addressed through reinforcement with "steel mesh + polymer cement mortar plastering", and a polyethylene moisture barrier is added inside to block salt spray penetration. If a prefabricated panel house is identified as a D-grade dilapidated building, it needs to be demolished and rebuilt; if retained for renovation, the structural connection joints should be the focus of reinforcement.
- Roof Renovation: Replace with fiberglass-reinforced asphalt shingles with a weather resistance of over 20 years, increase the slope to more than 30 degrees, and lay double-layer SBS waterproof membranes. Install metal drip edges and stainless-steel wind hooks (no less than 4 per square meter) at the eaves to enhance stability during typhoons.
- Door and Window Upgrades: Use broken-bridge aluminum alloy frames with double-glazed windows, and select weather-resistant silicone sealant for sealing. Install a 15-centimeter-high stainless-steel wave barrier at the bottom of door frames to resist storm surges.
II. Functional Space Optimization
- Kitchen and Bathroom Spaces: Expand the area to 6-8 square meters, use waterproof and non-slip full-body tiles for the floor, and install integrated stoves and moisture-proof facilities. Old houses without independent kitchens and bathrooms need to achieve functional independence through renovation.
- Storage and Activity Spaces: Add fishing gear storage areas based on the living habits of fishing villages. For民宿 (homestay) operators, optimize the design of public activity areas to highlight the sea view experience.
III. Climate Adaptation Design
- Salt Spray Corrosion Protection: Houses near the sea need to undergo salt spray tests, and protection standards should be formulated based on the corrosion level. Doors, windows, metal parts, etc., should use corrosion-resistant materials, and a long-term maintenance budget should be reserved.
- Ventilation and Dehumidification Systems: Install industrial-grade five-constant fresh air systems (with an air exchange capacity of 1500-2000 cubic meters per hour) to reduce moisture intrusion through micro-positive pressure design. The system should have dehumidification and three-stage filtration functions to extend the renovation lifespan to 5-10 years.
IV. Renovation Mode Selection
- Demolition and Reconstruction: Suitable for multi-story prefabricated panel houses built before 2000 that lack maintenance value, with priority given to demolishing D-grade dilapidated buildings.
- Original Site Relocation: Demolish the old and build new on the original site, retaining community relationships.
- Off-site Relocation or Monetary Compensation: Flexibly choose according to residents' needs.
Precautions: The renovation should be entrusted to a decoration company with experience in coastal projects, and a sufficient budget should be reserved to cope with salt spray corrosion and typhoon impacts.