Back to blog
Article

Clean Mobile Toilet Quotation Sheet

Admin October 11, 2026

The cost of treating mobile toilet residues (feces and sewage) varies significantly depending on the treatment method, region, and service company. Common charging models and reference prices are as follows:

1. Per-Trip Removal Model
Suitable for scenarios such as construction sites and temporary toilets at events, the cost typically includes feces extraction and short-distance transportation. The price range for a single removal is 800-1,500 yuan per vehicle, with each vehicle having a capacity of approximately 5-10 cubic meters. For example, Tianjin Meigan Environmental Technology Co., Ltd. quotes 88 yuan per service for mobile toilet septic tank cleaning, but note that this price may only apply to specific small equipment or low-frequency services; Beijing Xingbairong Cleaning Co., Ltd. charges 500 yuan per toilet for domestic sewage extraction services, which may include a complete single removal process.

2. Volume/Weight-Based Charging Model
Some companies charge based on the amount of waste treated, offering greater flexibility. When charged per cubic meter, the price range is 120-300 yuan per cubic meter; when charged per ton, it is approximately 60-300 yuan per ton. Based on the common capacity of 5-10 cubic meters per vehicle at construction sites, the cost for a single trip may reach 600-3,000 yuan per vehicle. For example, Beijing Jielida Pipeline Engineering Co., Ltd. charges 80 yuan per cubic meter for its extraction services, suitable for large-scale removal needs; Beijing Junxing Environmental Protection Technology Co., Ltd. charges 100 yuan per ton, with the actual volume requiring conversion based on the feces moisture content.

3. Rental Package Model
If opting for an integrated “rental + cleaning” service, the cost is usually calculated based on the number of units and the number of days of use, with quotes ranging from 400-800 yuan per unit per day. Such packages already include regular removal services, eliminating the need for separate payment for treatment fees, and are suitable for long-term use scenarios (such as extended construction periods or multi-day events). For example, some suppliers' packages may include daily removal once, covering toilet units for 5-10 users.

Precautions
The actual cost should be comprehensively evaluated based on the following factors:

  • Regional Differences: Higher transportation and labor costs in first-tier cities may result in a 20%-50% increase in fees;
  • Transportation Distance: Additional mileage fees may apply beyond the basic service range (e.g., within 5 kilometers);
  • Treatment Difficulty: Service providers may charge an additional 50%-100% unclogging fee if the septic tank is blocked or the sewage contains a high amount of impurities.
    It is recommended to contact local service providers for accurate quotes and to clarify the scope of services (such as whether disinfection, equipment maintenance, and other additional items are included).