Currently, there is no direct link to a complete video on the production of cement prefabricated houses, but the production process can be outlined based on descriptions from relevant videos.

Production Process in the Video 'Building a House Villa in Two Weeks':

  • Foundation Preparation: Workers first operate excavators to clear and level the residential land, then cover it with polypropylene film to isolate moisture. This step provides a stable and dry foundation environment for subsequent construction.
  • Foundation Pit Treatment: Concrete is poured into the foundation pit using a conveying pump. After the cement dries, bolts and right-angle brackets are fixed to provide anchor points for subsequent structural construction.
  • Component Installation: Cement piers are transported by trucks and fixed in the planned area. Ground beams are installed to strengthen structural integrity and distribute weight, enhancing the overall stability of the house.
  • Detail Refinement: After filling gaps and holes, the foundation pit is backfilled and compacted. Another layer of polypropylene film is laid to prevent moisture from affecting the house structure. Foam boards are stacked in the pit to improve insulation and provide cushioning.
  • Ground Floor Pouring: Finally, the ground floor is poured to complete the foundation construction of the house.

Production Process in the Video 'Building a Mini Cement House by Hand':

  • Material Mixing and Foundation Pit Pouring: Cement and sand are thoroughly mixed in a mixer and poured into the excavated foundation pit, then leveled to provide a base platform for subsequent construction.
  • Mold Use and Column Construction: Molds are placed on the foundation pit, and cement is poured into them. Sticks are inserted into the columns in the pit to make them sturdier. After the cement sets, the molds are removed, resulting in strong columns that serve as important supports for the house structure.
  • Roof Construction: Roof panels are placed on the columns, which support the roof to prevent collapse and ensure stability.
  • Floor Slab Construction: Cement is poured above the roof, leveled with a small scraper, and the mold boards are removed to create the second-floor slab, completing the construction of the upper structure of the house.