Images of Cement Prefabricated House Process

Admin September 18, 2026

Currently, images of the cement prefabricated house process cannot be directly provided, but the relevant process steps can be described in detail.

For common prefabricated concrete floor slabs, the production process is as follows:

  • Mold Assembly: This is the first step in making prefabricated concrete floor slabs. The various components of the mold need to be assembled according to the specifications and dimensions of the floor slabs to ensure accurate mold dimensions and stable structure, providing a good foundation for subsequent construction.
  • Installation of Embedded Parts: After the mold is assembled, embedded parts should be installed according to the design requirements. The role of embedded parts is to provide fixed points when the floor slab is connected to other components, ensuring the overall integrity and stability of the structure. For example, some bolts and steel bars may be embedded for subsequent connection with walls, beams, and other components.
  • Rebar Tying: Rebar is an important material for enhancing the strength of concrete structures. Rebars are tied inside the mold according to the design requirements to form a rebar framework. The specifications, quantity, and spacing of the rebars are subject to strict standards to ensure that the floor slab can withstand the corresponding loads.
  • Concrete Pouring: The well-mixed concrete is evenly poured into the mold through a concrete distribution device to ensure that the concrete is densely filled without voids or air bubbles. During the pouring process, attention should be paid to controlling the pouring speed and height of the concrete to avoid segregation.
  • Surface Troweling and Roughening: After the concrete is poured, it is troweled to make the surface flat and smooth. Then, roughening operations are carried out. The purpose of roughening is to increase the roughness of the floor slab surface and improve the bonding force between the floor slab and the subsequent finishing layer.
  • Curing and Demolding: After about 30 minutes of forming, the prefabricated concrete floor slab needs to be cured for 6 - 8 hours to allow the concrete to fully undergo hydration reactions and reach a certain strength. After curing, the demolding operation can be carried out to remove the floor slab from the mold and transport it to the construction site.

For cement mobile houses, the process involves directly pouring concrete into the mold, accelerating concrete hardening and strength growth through steam curing, and then demolding to form a complete house. It is then transported to the construction site by a transportation team and finally assembled into a complete residence using a crane.