Currently, there is no direct link to a video on the construction of cement prefabricated houses, but we can introduce construction cases and processes of cement prefabricated houses in two different regions.

A Case of a Prefabricated House in a Rural Area of South Korea with the Main Structure Completed in 14 Days

  • Foundation Treatment: First, the foundation is leveled, and then a bedding layer is poured. A layer of white plastic cloth is laid on the bedding layer, which may serve to provide some moisture-proofing effect. After that, plain concrete is poured as the bedding layer. Once it solidifies, foundation piles weighing 5 tons each are installed to provide a solid foundation support for the house.
  • Main Structure Assembly: The main structure of the house is assembled using prefabricated components. Mortise-and-tenon joints are used to connect the beams. This traditional and ingenious structural method can enhance the connection stability between components and reduce the use of additional connectors.
  • Subsequent Installation: After the main structure assembly is completed, the stairs, which are also prefabricated components, are hoisted and installed directly. Then, a 5-centimeter-thick floor slab, also a prefabricated component, is laid. Finally, grouting is carried out on the gaps between various components to make the entire house structure more compact and firm, improving the overall integrity and waterproof performance of the house.

A Case of a Cement 'Prefabricated House' in a Rural Area of Henan, China, with a Villa Completed in 4 Hours

This type of cement 'prefabricated house' in rural Henan adopts a fully reinforced concrete structure. A fully reinforced concrete structure means that during the prefabrication process, steel bars are placed inside the concrete. The steel bars can bear tensile forces, while the concrete can bear compressive forces. Their协同工作 (synergistic operation) greatly improves the load-bearing capacity and seismic resistance of the house. This structure enables the main structure of the house to be completed in a short time. Completing the main structure of a villa in 4 hours reflects its efficient construction characteristics. However, the specific construction process may involve technical aspects such as the transportation of large prefabricated components, precise hoisting and positioning, and rapid connection and fixation to ensure the safe and high-quality completion of house construction within a short time.