Bazhou Mobile Toilet Project
There are two main projects involving mobile toilets in Bazhou, namely the project related to the Altun Mountains National Nature Reserve Administration Bureau in Xinjiang Bayingolin Mongol Autonomous Prefecture and the second bid section of the Bazhou urban infrastructure renovation project.

Project Related to the Altun Mountains National Nature Reserve Administration Bureau in Xinjiang Bayingolin Mongol Autonomous Prefecture
This project includes the construction of temporary guard posts (mobile barracks), installation of iron fences, and the construction of supporting toilets. The winning bidder is Xinjiang Zhuoshengyuan Construction Engineering Co., Ltd., indicating that the company has certain capabilities and qualifications in mobile toilet construction and can undertake the construction tasks of this project. The project is scheduled to be completed and handed over for acceptance before June 15, 2025. Such a long construction period may be due to the special environmental conditions of the project. The Altun Mountains National Nature Reserve is located in a remote area with complex natural conditions, making construction difficult and requiring sufficient time to ensure project quality and safety. The construction of supporting toilets is crucial for the management and protection work in the reserve, providing basic living facilities for the management and protection personnel, improving their convenience and comfort while working in the reserve, and also contributing to enhancing the management level of the reserve.
Second Bid Section of the Bazhou Urban Infrastructure Renovation Project - Mobile Public Toilet Procurement
The proposed winning bidder for this project is Hong Construction Engineering Co., Ltd., with a winning bid price (total unit price) of 836,000.00 yuan. This price reflects the cost situation of mobile public toilet procurement, covering expenses in various aspects such as design, production, and transportation of the public toilets. The supply period is from the date of contract signing to the completion of supply before July 30, 2024, with a publicity period from July 24, 2024, to July 26, 2024. The relatively short supply period reflects the project's requirement for timeliness. Urban infrastructure renovation needs to be completed in a timely manner to meet the needs of urban residents for public toilets as soon as possible and improve the city's public service level. Mobile public toilets are highly flexible and movable, allowing for reasonable layout and adjustment according to the pedestrian traffic and usage needs in different areas of the city, effectively alleviating the problem of uneven distribution of public toilets in the city.