Baoshan Container House Installation

Admin September 14, 2026

For the installation of container houses in Baoshan, you can contact local professional companies such as Yunnan Meijie Steel Structure Engineering Co., Ltd. and Kunming Chumeng Light Steel Portable Houses, which offer one-stop services including design, production, sales, and installation.

Key Points of the Installation Process

  • Foundation Preparation: Installation should be carried out on a flat ground. For packing-box units, place the chassis on the prepared foundation first.
  • Frame Construction:
    • When installing assembled container houses, first connect the bottom corners of the boxes to the bottom beams using hexagon socket bolts, but do not tighten them temporarily. After adjusting to ensure that the diagonal difference of the bottom frame is ≤3mm, tighten the bolts.
    • For the installation of packing-box units, first install four hexagonal columns and then the top frame.
  • Secondary Beam and Floor Installation:
    • For assembled container houses, install π-shaped secondary beams according to the positioning hole positions on the long beams and fix them with self-tapping screws. The tops of the π-shaped secondary beams and the bottom beams need to be fixed with round-head drill-tail screws. Lay the floor base plates along the 6-meter direction, pre-drill holes at both ends of the base plates, and cut the corners according to the chalk lines. Make marks at the midlines of the π-shaped beams and then lay the floor. The joints of the floor should coincide with the midlines of the π-shaped beams. After laying, snap chalk lines according to the marks and fix them with cross flat-head燕尾丝 (Note: '燕尾丝' may not have a direct English equivalent, here it is kept as is for the context of construction fasteners, a more general term could be 'special screws'). The nail spacing should be 300 - 350mm.
    • Overall polish the floor, especially the seams between the plates. Apply PVC special floor adhesive and wait for 10 - 15 minutes before laying the floor covering. Remove the air and, if possible, weld the joints of the floor covering.
  • Installation of Other Components: For the installation of packing-box units, install downspouts and install elbows as required.

Precautions for Choosing an Installation Company

  • Qualifications and Reputation: Choose a company with qualifications and a good reputation. You can refer to user reviews. For example, Yunnan Meijie Steel Structure Engineering Co., Ltd. has a rating of 5.0 and 1 review, while Kunming Chumeng Light Steel Portable Houses has a rating of 4.8 and 4 reviews.
  • Service Scope: Confirm whether the company's service scope covers areas such as Longyang and Tengchong in Baoshan to ensure timely services.
  • Product Types: Choose a company that can provide the appropriate type of container house according to your needs, such as residential containers and office containers.