Back to blog
Article

Baoji Mobile Toilet Engineering Construction

Admin October 22, 2026

The following is information about Baoji mobile toilet engineering construction:

I. Manufacturer Information

The Xi Niu Stainless Steel Light Box Spirit Fortress Rolling Outdoor Newspaper Display, Landscape Sculpture Gallery Frame Signage, Road Name Sign Manufacturer (Baoji Branch) is a company in the Baoji area specializing in the customization of mobile toilets for construction sites. The company has a production base of 10,000 square meters and a registered capital of 5 million yuan, demonstrating strong production capacity and financial strength. It is equipped with 50 technical and service personnel who can provide comprehensive technical support and service guarantees. The company offers a wide range of products, with over a hundred models available, and supports customization services to meet the individual needs of different customers. The company's address is located at Building B07, Standard Factory Building, West Zone, Industrial Park, Economic and Technological Development Zone, Baoji City, Shaanxi Province. The contact person is Manager Shan, and the contact number is 18262840009, facilitating customer inquiries and cooperation.

II. Project Information

The Yongchuan Town 2026 Household Toilet Renovation Project is another mobile toilet-related project in the Baoji area. The supplier for this project is Shaanxi Linting Project Management Co., Ltd., located at Group 1, No. 110, Luojialing Village, Xiguan Street, Jintai District, Baoji City, Shaanxi Province. The construction scope mainly includes the installation of finished three-compartment septic tanks and squat toilets for 327 households, as detailed in the bill of quantities and competitive negotiation documents. The project involves the procurement of 327 sets of rural sanitary toilet fixtures, supporting facilities, and construction services, as well as the purchase of 327 sets of three-compartment septic tank canisters, toilet fixtures, connecting pipes, and the construction of underground and specified above-ground ancillary facilities. The construction period for this project is 60 calendar days, requiring the supplier to complete the construction tasks within the specified time frame to ensure the project is delivered on schedule.

III. Construction Key Points and Precautions

When carrying out Baoji mobile toilet engineering construction, attention should be paid to construction quality and safety. The construction unit should strictly follow the design drawings and construction specifications to ensure that all facilities are installed in place and securely connected. At the same time, on-site construction management should be strengthened to ensure the safe and orderly progress of the construction process.