Video Explanation of Assembling Prefabricated Houses
The video explanation about assembling prefabricated houses mainly covers the following content:

Prefabricated House with Main Structure Completed in 14 Days
This video demonstrates the rapid construction process of a self-built rural house, with the main structure completed within 14 days. The core steps include:
- Foundation Treatment: After leveling the site, a concrete cushion is poured, and foundation piles weighing approximately 5 tons are installed. They are fixed with footplates to ensure stability.
- Main Structure Assembly: Mortise-and-tenon joints are used to quickly connect the beams. Prefabricated stairs and floor slabs are hoisted into place, and grouting is applied to the component gaps to enhance integrity.
- Technical Features: Standardized production of prefabricated components enables efficient on-site assembly, making it suitable for projects with strict deadlines.
Full Process Analysis of Installing Prefabricated Assembly Buildings
The video provides a detailed analysis of the hoisting process from bay windows to balconies, covering the following steps:
- Positioning and Rebar Tying: Positioning is determined through line laying, and rebars for wall columns and floor slab bottoms are tied to provide skeletal support for subsequent pouring.
- Pipeline Embedding: Channels for water and electricity pipelines are reserved before concrete pouring to avoid structural damage from later slotting.
- Concrete Pouring: A layered pouring process is adopted to ensure a dense connection between the floor slab and beams, enhancing seismic performance.
- Technical Advantages: Modular design reduces on-site wet work, ensures high construction precision, and meets green building standards.
Details of the Stable Connection Between Prefabricated Floor Slabs and Beams
For prefabricated steel-concrete frame structures, the video focuses on explaining the connection methods between prefabricated floor slabs and beams:
- Fully Prefabricated Installation: Reserved rebars in the floor slab are connected to those in the beam through sleeve grouting, forming an integrated load-bearing system.
- Joint Treatment: High-strength grouting material is used to fill the gaps, ensuring that the load-bearing capacity at the connection is not lower than that of a cast-in-place structure.
- Application Scenarios: Suitable for high-rise buildings and areas with high seismic requirements, ensuring structural safety.
Actual Footage of Workers Building a Prefabricated Assembly Residence
The video records the entire process of building a wooden house from an empty lot to completion, highlighting the following operations:
- Chassis Frame Construction: Prefabricated components are used to assemble the house foundation, which is fixed with metal connectors to ensure stability.
- Wall and Partition Wall Installation: Wall modules and partition wall frames are installed layer by layer, with openings reserved for doors and windows to improve construction efficiency.
- Roof Construction: Lightweight prefabricated roof panels are used and connected to the walls with bolts, simplifying high-altitude work.
- Material Selection: Wood is the primary material, combined with metal connectors, balancing environmental protection and structural strength.