The installation of housing containers in Ankang requires following steps such as trench excavation, foundation construction, steel frame installation, floor installation (for multi-story buildings), color steel plate installation, first-floor floor construction, door and window installation, and interior decoration. Attention should also be paid to structural safety, load limits, and maintenance requirements.

I. Installation Steps
- Foundation Construction: Trenches need to be excavated and foundations poured. Foundation types include brick foundations or concrete foundations to ensure a stable foundation.
- Steel Frame Installation: The steel frame of the container house is erected, ensuring that connecting bolts are tightened, components are accurately positioned, and avoiding false welding or missed welding.
- Floor and Wall Installation: For multi-story buildings, prefabricated floors need to be installed; walls are made of color steel plates, with circuits, drainage pipes, and doors and windows pre-installed to reduce on-site construction time.
- Floor and Decoration: Complete the pouring of the first-floor floor, ensuring a dense and crack-free surface; finally, conduct interior decoration, including ceiling and wall treatments.
II. Usage Precautions
- Structural Safety:
- Do not disassemble screws or components; non-professionals are not allowed to modify the structure.
- The floor load must not exceed the static load value specified in the contract; avoid vigorous activities such as jumping or running.
- Environmental Adaptability:
- The indoor floor should be 50mm higher than the outdoor floor, and drainage ditches should be built to prevent water accumulation.
- Steel components need to be regularly derusted and painted to prevent corrosion; enhanced anti-corrosion measures are required in coastal or humid areas.
- Functional Limitations:
- Open flame stoves are prohibited indoors; if a kitchen or bathroom needs to be set up, a range hood should be installed and waterproof and anti-corrosion treatments should be done, with the fire source at least 50cm away from the wall.
III. Maintenance Requirements
- Routine Inspection: Regularly inspect the tightness of bolts, the sealing of walls and roofs, and promptly repair damaged parts.
- Anti-Corrosion Treatment: Steel components need to be repainted every 1-2 years, with the maintenance cycle shortened in coastal areas.
- Cleaning and Maintenance: Keep the interior and exterior clean and avoid scratching the surface of color steel plates with sharp objects.