3x6 Container House Design Drawings
The design drawings of a 3x6 container house typically include first and second-floor design plans, rendering images, and installation diagrams. The design must integrate customer needs, building dimensions, functional requirements, and material constraints, with a production cycle of approximately 5 days and relatively fast installation speed.

Types and Content of Design Drawings
The design drawings of a 3x6 container house are the core basis for project implementation and mainly include three categories:
- Floor Plans: These are designed for both the first and second floors, clearly indicating building dimensions (e.g., length of 6 meters and width of 3 meters), room layouts (e.g., positions of bedrooms, living rooms, kitchens, and bathrooms), dimensions and positions of door and window openings, and the thickness of internal partition materials (e.g., rock wool boards and color-coated steel sheets).
- Rendering Images: These showcase the house's exterior (e.g., color, material, decorative lines) and interior decoration style (e.g., flooring, wall finishes, furniture arrangements) through 3D rendering, helping customers intuitively visualize the final effect.
- Installation Diagrams: These provide detailed instructions on the assembly sequence of container modules, connection methods (e.g., bolt fixation, welding points), roof waterproofing treatments, and pre-buried paths for water and electricity pipelines, ensuring standardized construction.
Core Design Elements
- Customer Needs: Functional zoning is determined based on the usage scenario (e.g., residential, office, or commercial). For example, residential types require more bedrooms, while office types need optimized lighting and sound insulation.
- Building Dimensions: The standard 3x6-meter container module must consider transportation constraints (e.g., road width and bridge height) to avoid additional costs from oversized transportation.
- Functional Requirements: Insulation layers (e.g., increased thickness of polyurethane foam in northern regions) and ventilation systems (e.g., operable skylights in southern regions) are designed according to climatic conditions, with reserved positions for water and electricity connections.
- Material Constraints: Production equipment imposes requirements on sheet thickness (e.g., color-coated steel sheets are typically 0.4-1.2 millimeters thick), necessitating cost control while meeting structural strength requirements.
Production and Installation Cycle
- Production Cycle: From design confirmation to finished product delivery, it takes approximately 5 days, including material procurement, module cutting, welding, anti-corrosion treatment, and interior decoration.
- Installation Speed: Modular design significantly improves installation efficiency, allowing the assembly of 100 container houses in about 3 days. The main processes include foundation construction (e.g., concrete pads), module lifting, connection and fixation, and exterior decoration.
Design drawings must be created using professional software (e.g., AutoCAD, SketchUp) and reviewed by structural engineers to ensure safety before being delivered to customers for confirmation and proceeding to the production stage.